PROJECT DESCRIPTION

Sewer Replacement and Upsizing Project

The project includes replacement of 21-inch, 12-inch & 8-inch diameter PVC sewer main, manholes, sewer laterals; cold-mill grind and overlay of existing road section for Plaza Blvd, as well as National City Boulevard from and including the intersection of Mile of Cars Way through the intersection of 22nd St; installation of curb & gutter, AC dikes, AC driveways entrances and driveways; sidewalks, pedestrian curb ramps for ADA compliance, signing and striping, and other related improvements.

SCHEDULE

Timeline for Sewer Replacement and Upsizing Project

FUNDING

Funding for Sewer Replacement and Upsizing Project

UPDATES

The most recent project updates are listed below:

PROJECT UPDATE

November 16, 2017

Sewer Upsizing: Plaza Blvd between Euclid and Harbison was paved full width during the past 2 weeks. The roadway has been marked out for permanent lane striping and traffic signal loop detectors, which will occur during the next two weeks. Once this is done, some slurry seal will be applied to a portion of Plaza east of Harbison. The slurry seal will be the final element of work and the project will be complete thereafter.

PROJECT TEAM

Contact Information

Contractor

Portillo Concrete, Inc.
Attn: Fabian Roman
3527 Citrus St.
Lemon Grove, CA 91945
(619) 466-4639

Email: froman@portilloconcreteinc.com

Project Management

Project Professionals Corp.
Attn: Derrick Anderson
4499 Ruffin Road, Suite 250
San Diego, CA 92123
Phone: (858) 634-8180
Email: derrick@ppc-sd.com

City of National City

Stephen Manganiello
City Engineer
1243 National City Blvd.
National City, CA 91950
Phone: (619) 336-4380

CONTACT

We’d really love to hear from you! Drop us an email and we’ll get back to you as soon as we can.

Copyright © 2016 City of National City. All Rights Reserved.